A Ellery company - serving Simi Valley, CA
Garage Conversion ADU in West Hills, CA | Ellery ADU Studio Simi Valley

Garage Conversion ADU in West Hills - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

13+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Fast, Reliable Garage Conversion ADU Across West Hills

Garage conversion ADUs in West Hills typically run $95,000-$165,000 all-in, from measured drawings through final LADBS inspection, with most projects completing in 6-10 months. Because a large share of West Hills parcels fall within LA’s Very High Fire Hazard Severity Zone, your garage conversion must meet WUI ignition-resistant construction standards even when the existing walls stay standing, adding material cost and plan-check scrutiny that non-fire-zone neighbors simply don’t face.

Call (820) 444-6584

We’re Ellery ADU Studio, a design-build practice founded in 2015, and our Garage Conversion ADU team serves West Hills from our Los Angeles office. Nadia Ellery and our crew know the difference between a Woodland Hills lot on flat valley floor and a West Hills parcel tucked against the Santa Susana foothills where the VHFHSZ line cuts through. That local knowledge shows up in your permit set before we submit to LADBS, not after the first correction cycle.

Call (820) 444-6584 to schedule your free estimate. Every project starts with a written price under Haven Standard Clause 1, and we offer a Free Second Opinion on any written estimate already in your hands.

Why Ellery ADU Studio Simi Valley Is West Hills’s Preferred Garage Conversion ADU Company

We’ve designed, permitted, and built more than 900 ADUs since 2015, and a growing share of them sit in West Hills neighborhoods like Orcutt, Hidden Lake, and the streets bordering Bell Canyon. These homeowners came to us after learning that their 1960s ranch’s original 100-amp panel and cloth-wrapped wiring wouldn’t pass modern load calculations, or after another contractor missed their VHFHSZ status and got flagged on first plan check.

Our crews are background-checked, uniformed, and licensed, with our license number on every page. Dispatch and scheduling are coordinated from our Los Angeles office, but the crew that opens your garage wall knows West Hills: the Santa Ana wind patterns that drive rain against north-facing garage doors, the 100°F summer days that make Title 24 energy compliance a real engineering exercise, and the LADBS plan checkers who now expect ignition-resistant construction callouts on every West Hills submittal.

Under The Haven Standard, you receive a written price before any work starts, a documented photo record on every visit, and our 365-Day Done Right Promise backed in writing. A live person answers calls 24/7. No voicemail queue. No callback that doesn’t materialize.

Our Garage Conversion ADU Services in West Hills

Contractor applying spray foam insulation for garage conversion ADU
Our Garage Conversion ADU Services in West Hills

Attached Garage Conversion

Attached garage conversions are the most common ADU type we build in West Hills, and they’re also where the most surprises hide. Your garage shares a wall with the house, which means the existing electrical panel, sewer lateral, and foundation all become part of the scope. On a 1968 ranch in the Orcutt neighborhood of West Hills, our crew opened the attached garage wall and found cloth-wrapped wiring, a 100-amp panel already at capacity, and a sill plate that had rotted from a failed slope - plus the parcel’s VHFHSZ status meant ember-resistant vents and ignition-resistant cladding had to be spec’d before we framed. We priced the panel upgrade, sill replacement, and WUI details as written allowances, got the homeowner’s signed approval before demolition, and passed LADBS plan check on the first submittal after front-loading the fire-zone callouts.

Because a large share of West Hills parcels sit inside LA’s Very High Fire Hazard Severity Zone, a garage conversion ADU here must meet WUI ignition-resistant standards (Class A roofing, ember-resistant vents, ignition-resistant cladding) even when the garage walls stay standing - so an attached garage conversion in West Hills can cost more in fire-rated details than a full detached build on a non-VHFHSZ lot in Woodland Hills. We confirm fire-zone status before drafting a single sheet.

Attached Garage Conversion

Detached Garage Conversion

West Hills lots run generous by LA standards, often a quarter-acre or more, so detached garages are common along streets like Roscoe Boulevard and Fallbrook Avenue. Converting one to an ADU gives you more flexibility on utilities - separate electric meter, separate sewer connection - but it also means running new trenching across a yard that may carry mature oak roots or undocumented irrigation lines. We map the full utility path in the permit set, not discover it with a backhoe.

Detached Garage Conversion

Garage Partition & Bathroom Add

Not every West Hills homeowner wants a full ADU. Some need a guest suite with bath, a home office with powder room, or a rental unit that keeps the garage bay for storage. We partition the space, add the wet wall, and engineer the plumbing tie-in to your existing sewer lateral - which, on older West Hills homes, may need replacement before the city issues certificate of occupancy. We price that possibility as a written allowance before we cut concrete.

Garage Partition & Bathroom Add

Garage JADU

A Junior ADU (JADU) lives inside your existing garage footprint, shares your house’s kitchen and bathroom or gets its own efficiency kitchen, and must be owner-occupied. For West Hills homeowners who want rental income without the full ADU investment, a garage JADU caps out at 500 square feet and can share utilities. The catch: your existing 100-amp panel and original sewer lateral still need to handle the load, and VHFHSZ rules still apply to exterior modifications. We model both constraints in the initial permit set.

Garage JADU
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (820) 444-6584

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Trusted Brands We Coordinate in West Hills

Ellery ADU Studio specifies and coordinates prefab and modular systems from Dvele, Mighty Buildings, and Plant Prefab within the same single contract that covers your design, permitting, and construction. For West Hills homeowners considering a hybrid approach - say, a Plant Prefab unit dropped onto a new foundation while the existing garage becomes the JADU - we engineer the site prep, utility tie-ins, and LADBS coordination as one scope at one written price. No designer pointing at the builder, no builder blaming the drawings.

Common Garage Conversion ADU Problems We See in West Hills Homes

Contractors installing metal framing and electrical conduit for a garage conversion
Common Garage Conversion ADU Problems We See in West Hills Homes
  • 100-amp panel and cloth wiring fail load calculations. The 1950s-1970s ranch homes that dominate West Hills commonly carry original electrical systems that cannot handle the ADU’s HVAC, kitchen appliances, and lighting load. We find this on inspection, price the service upgrade as a written allowance, and get your signed approval before touching the panel.
  • VHFHSZ status missed in initial drafting. Contractors who skip pulling the VHFHSZ map before submitting ADU plans to LADBS routinely get flagged on first plan check for missing ignition-resistant construction callouts. We confirm fire-zone status on every West Hills parcel before drafting a single sheet, front-loading the WUI details into the permit set.
  • Garage slab and sill plate compromised by decades of weathering. West Hills sits at the valley’s western inlet, where Santa Ana wind-driven rain and 100°F temperature swings have already damaged original framing before walls are opened. Our inspection documents the condition; our contract includes a written allowance for sill replacement and slab remediation if needed.
  • Title 24 energy calculations demand aggressive insulation and HVAC sizing. West Hills summer temperatures routinely top 100°F, so a garage conversion ADU needs robust attic insulation and high-efficiency mechanical systems to pass energy compliance. We run the calc during design, not during inspection, and spec equipment that handles the load without change orders.
Get the price in writing before anything starts.Serving West Hills - a real person answers, day or night.
Call now

Pricing for Garage Conversion ADU in West Hills, CA

Garage conversion ADUs in West Hills typically run $95,000-$165,000 all-in, drawings through final inspection. Attached garage conversions on VHFHSZ parcels trend toward the upper half of that range because of ignition-resistant cladding, ember-resistant vents, and Class A roofing requirements. Detached garage conversions on non-fire-zone lots can land lower, though new utility trenching may offset the savings.

What moves the number: panel and service upgrades ($8,000-$18,000), sewer lateral replacement ($6,000-$14,000), foundation repair or sill plate replacement ($4,000-$12,000), and WUI compliance details on VHFHSZ parcels ($5,000-$15,000). We price every line item in writing before work starts, per Haven Standard Clause 1. No call-for-a-quote. No scope creep.

Call (820) 444-6584 for your exact number. Estimates are free, and we offer a Free Second Opinion on any written estimate already in hand.

We Also Serve Cities Near West Hills

Architect designing an accessory dwelling unit floor plan at a desk.
We Also Serve Cities Near West Hills

Our crews work throughout the west San Fernando Valley, including Garage Conversion ADU in West Hills and neighboring Canoga Park, Winnetka, Calabasas, and Chatsworth. Each city carries its own LADBS or LA County plan-check path, its own fire-zone mapping, and its own vintage housing stock. We adjust the permit set accordingly.

Serving West Hills, CA - Our Local Coverage Area

We’re based in the West Hills area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs - Garage Conversion ADU in West Hills

Contractors installing metal wall studs for a garage conversion ADU
FAQs - Garage Conversion ADU in West Hills

What West Hills Customers Say

Trusted by homeowners across West Hills and surrounding areas.

★★★★★

"Every allowance was itemised at the start, so the finish selections did not turn into a surprise at the end."

Benedict H. · Verified customer
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V. · Verified customer
★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T. · Verified customer

Why West Hills Chooses Ellery ADU Studio Simi Valley

We set the standard for garage conversion adu in West Hills.

Simi Valley Permit Speed

We know exactly what Simi Valley's building department requires and submit complete packages the first time, so your project moves from approval to groundbreaking faster than the local average.

Designed for Your Property

Every lot in Simi Valley is a little different. We evaluate your specific site conditions, setbacks, and utility access before drawing a single line - so your ADU fits your property perfectly.

Accountable From Start to Finish

You'll work with the same dedicated team from design through final inspection, with clear communication and honest updates every step of the way - no surprises, no handoffs to strangers.

How It Works in West Hills

Getting your garage conversion adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your garage conversion adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in West Hills - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

Ready for Garage Conversion ADU in West Hills?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in West Hills.

(820) 444-6584

Request a Free Estimate in West Hills

Tell us about your garage conversion adu needs - we'll respond within the hour.

By providing your information above, you agree to the terms of our Privacy Policy and agree to be contacted by phone, email, or text about your service request, including from the local pros who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - Fast Dispatch